TwinCore
  1. Base data
  2. Digital twin
  3. Construction control
  4. Construction monitoring
  5. Sales

Construction monitoring

Watch the site in real time: sensor readings appear on the digital twin, and you are alerted the moment one crosses its limit.

Site sensors — live

Sample data

Pick a sensor on the model or in the list to see its reading.

Schedule: from today to the finished building

Sample data
Today
  1. Land clearance
  2. Foundations
  3. Frame
  4. Façade and services
  5. Handover
  6. Milestones

PlanForecastDone

  • Frame tops out2026-11-23
  • Building weathertight2027-02-01
  • Commissioning2027-03-22
  • Handover2027-04-12

Finished building — forecast handover

2027-04-12

Planned for 2027-03-29 — 2 weeks behind

71% complete26 weeks to go

Floors
12
Homes
154
Ground floor
Shops and services
Handed over
Fully finished, with occupancy permit

Warnings

Sample data
  • 09:42CT-08: concrete at 61 °C — cooling started
  • 08:15L08 slab pour complete — 92 m³
  • YesterdayCR-01: crane load 96% — lifting stopped automatically
  • YesterdayH&S: edge protection inspected, issue closed

What it covers

  1. 1IoT sensorsCrane, concrete, settlement, tilt, dust and noise readings received in real timeCrane loadConcrete temperatureSettlement, tiltDust, noise
  2. 2AlertsWhen a reading crosses its limit, the person responsible is notified and it is loggedLimitsNotificationsLog
  3. 3Daily site reportWorkforce, equipment, weather and health & safety status in one placeWorkforceEquipmentWeatherH&S
  4. 4TrendsProgress, concrete poured and incidents over recent days14 daysChartsReports